Comment: !!!!! Prubehy v poradku !!!, opakujeme stejne podminky, akorat OG bod 2 rozpojen a spojen

Golem shot: 6227

2011-10-25 - 123302



Basic parameters:
  • Chamber pressure pchamber : 2.13->2.13 mPa (vacuum shot)
  • Chamber temperature: 0 grad C
  • CBt capacitors ( mF) charged to: 400 V
  • CBD capacitors (3.6 mF) charged to: 00 V, triggered 3,0 ms after Bt
  • CCD capacitors (11.3 mF) charged to: 300 V, triggered 3,0 ms after Bt
  • CST capacitors (2.7 mF) charged to: 0 V, triggered 0,0 ms after Bt
  • charging log: t, UB, UBD, UCD, UDS, pchamber
  • Time since session beginning: 8468 s
Data (sampling interval Ts=100 kHz):

DAS:

NI

NIturbo.ONN
Diagnostics: (configuration)

Analysis:

SafetyFactor_JK

IDLAnalysis_TM

Thanks to the specific help and