Comment: Presyceno, vzdalujeme sondu od limiteru na pozici D-E:7-8

Golem shot: 6784

2012-01-06 - 125647



Basic parameters:
  • Chamber pressure pchamber : 4.47->10.93 mPa (request: 10 mPa)
  • Chamber temperature: 10 grad C
  • CBt capacitors ( mF) charged to: 800 V
  • CBD capacitors (3.6 mF) charged to: 00 V, triggered 3,0 ms after Bt
  • CCD capacitors (11.3 mF) charged to: 400 V, triggered 2,0 ms after Bt
  • CST capacitors (2.7 mF) charged to: 00 V, triggered 0,0 ms after Bt
  • charging log: t, UB, UBD, UCD, UDS, pchamber
  • Time since session beginning: 1953 s
Data (sampling interval Ts=100 kHz):

DAS:

NIturbo.ONN
Diagnostics: (configuration)

HXR_LK

Analysis:

SafetyFactor_JK

Thanks to the specific help and