Comment: znovu

Golem shot: 7031

2012-02-02 - 123843



Basic parameters:
  • Chamber pressure pchamber : 3.53->3.53 mPa (vacuum shot)
  • Chamber temperature: 100 grad C
  • CBt capacitors ( mF) charged to: 600 V
  • CBD capacitors (3.6 mF) charged to: 00 V, triggered 3,0 ms after Bt
  • CCD capacitors (11.3 mF) charged to: 400 V, triggered 2,0 ms after Bt
  • CST capacitors (2.7 mF) charged to: 00 V, triggered 0,0 ms after Bt
  • charging log: t, UB, UBD, UCD, UDS, pchamber
  • Time since session beginning: 9018 s
Data (sampling interval Ts=100 kHz):

DAS:

NIturbo.ONN
Diagnostics: (configuration)

HXR_LK

Analysis:

Thanks to the specific help and