Comment: PHA na 1, vzdalenost od dveri 2m, napravo od dveri 1,8m

Golem shot: 7067

2012-02-02 - 144546



Basic parameters:
  • Chamber pressure pchamber : 3.62->14.91 mPa (request: 15 mPa)
  • Chamber temperature: 100 grad C
  • CBt capacitors ( mF) charged to: 600 V
  • CBD capacitors (3.6 mF) charged to: 00 V, triggered 3,0 ms after Bt
  • CCD capacitors (11.3 mF) charged to: 400 V, triggered 2,0 ms after Bt
  • CST capacitors (2.7 mF) charged to: 00 V, triggered 0,0 ms after Bt
  • charging log: t, UB, UBD, UCD, UDS, pchamber
  • Time since session beginning: 16640 s
Data (sampling interval Ts=100 kHz):

DAS:

NIturbo.ONN
Diagnostics: (configuration)

HXR_LK

Analysis:

DAStests_JK

Thanks to the specific help and