Comment: vacuum shot, good Uloop, but Fluke measured current 10 A - all top coils disconnected, U_B down to 100 V

Golem shot: 7089

2012-02-02 - 201307



Basic parameters:
  • Chamber pressure pchamber : 3.47->3.48 mPa (vacuum shot)
  • Chamber temperature: 100 grad C
  • CBt capacitors ( mF) charged to: 100 V
  • CBD capacitors (3.6 mF) charged to: 00 V, triggered 3,0 ms after Bt
  • CCD capacitors (11.3 mF) charged to: 400 V, triggered 2,0 ms after Bt
  • CST capacitors (2.7 mF) charged to: 00 V, triggered 0,0 ms after Bt
  • charging log: t, UB, UBD, UCD, UDS, pchamber
  • Time since session beginning: 5995 s
Data (sampling interval Ts=100 kHz):

DAS:

NIturbo.ONN
Diagnostics: (configuration)

Analysis:

Thanks to the specific help and