Comment: System check II ..

Golem shot: 7274

2012-02-17 - 082736



Basic parameters:
  • Chamber pressure pchamber : 3.79->3.79 mPa (vacuum shot)
  • Chamber temperature: N/A grad C
  • CBt capacitors ( mF) charged to: 600 V
  • CBD capacitors (3.6 mF) charged to: 00 V, triggered 3,0 ms after Bt
  • CCD capacitors (11.3 mF) charged to: 400 V, triggered 2,0 ms after Bt
  • CST capacitors (2.7 mF) charged to: 00 V, triggered 0,0 ms after Bt
  • charging log: t, UB, UBD, UCD, UDS, pchamber
  • Time since session beginning: 1134 s
Data (sampling frequency f s=1 MHz):

DAS:

NIturbo.ONN
Diagnostics: (configuration)

IPCameraChamber

FastCamera

Spectrometer

HXR_LK

Analysis:

SafetyFactor_JK

Spectrograms_TO

Thanks to the specific help and