Comment: DAS problem, HTS off, repeat

Golem shot: 8617

2012-05-10 - 114406



Basic parameters:
  • Chamber pressure pchamber : 3.06->20.12 mPa (request: 20 mPa)
  • Chamber temperature: N/A grad C
  • CBt capacitors ( mF) charged to: 600 V
  • CBD capacitors (3.6 mF) charged to: 00 V, triggered 0,0 ms after Bt
  • CCD capacitors (11.3 mF) charged to: 300 V, triggered 2,0 ms after Bt
  • CST capacitors (2.7 mF) charged to: 00 V, triggered 0,0 ms after Bt
  • charging log: t, UB, UBD, UCD, UDS, pchamber
  • Time since session beginning: 10854 s
Data (sampling frequency f s=1 MHz):

DAS:

NIturbo

Papouch_St

NIbasic.ONN
Diagnostics: (configuration)

Analysis:

SafetyFactor_JK

Laszlo

Acknowledgement: ,
Thanks to the specific help and