Comment: Plasma test - 400V, zapnuta predionizace

Golem shot: 9049

2012-06-08 - 000459



Basic parameters:
  • Chamber pressure pchamber : 1.78->9.96 mPa (request: 10 mPa)
  • Chamber temperature: N/A grad C
  • CBt capacitors ( mF) charged to: 1000 V
  • CBD capacitors (3.6 mF) charged to: 400 V, triggered 0,0 ms after Bt
  • CCD capacitors (11.3 mF) charged to: 00 V, triggered 0,0 ms after Bt
  • CST capacitors (2.7 mF) charged to: 00 V, triggered 0,0 ms after Bt
  • charging log: t, UB, UBD, UCD, UDS, pchamber
  • Time since session beginning: 12427 s
Data (sampling frequency f s=1 MHz):

DAS:

NIturbo

TektronixDPO3014

Papouch_St

NIstandard.ONN
Diagnostics: (configuration)

MHD_TM

MirnovCoils_JK

Analysis:

SafetyFactor_JK

Acknowledgement: ,
Thanks to the specific help and