Tokamak GOLEM - Shot Database - #48481

| Time stamp | |
|---|
| 25-04-10 10:14:36 |
[Shot logbook]| The session mission | Infrastructure/CurrentStabilization/Buryanec-CommissioningAETechron-2025Commmissioning of I_p stabilization technology |
|---|
The session ID  | 48477  |
|---|
| The discharge comment | Test AETechron voltage operation with inductive load with modify waveform to part of part voltage |
|---|
Discharge command  | /Dirigent.sh --discharge --operation.higherpower "voice='on',analysis='off',wg_voice='on',RawDataAcquiring='on',diagnostics_onstage='off',diagnostics_offstage='off',infrastructure= ... |
On stage diagnostics
Basic diagnostics Data flow:

Documentation:
Off stage diagnostics
Infrastructure
Chamber
Bt and Ecd
,
Parameters

:U_Bt=0,t_Bt=0,O_Bt='CW',U_cd=200,t_cd=1000,O_cd='CW'
Working gas
Parameters

:S_mode='U_v',S_gas='H',p_H=15,U_v=0
Position stabilization
:
Parameters

:main_switch='off',radial_switch='on',radial_waveform='1000,0;2000,-5;5000,-10;9000,-20;30000,0',vertical_switch='on',vertical_waveform='1000,0;2000,-5;7000,-10;8000,-20;30000,0'
Current stabilization HEY
Parameters
:main_switch='on',waveform='1000,0;2000,-2;5000,-2.5;10000,-3;15000,-3.5;20000,4;25000,4.5;30000,5;35000,0,40000,0'
 |
 |
 |
Acknowledgement
Thanks to the specific help
The tokamak GOLEM controll SW @ 