Golem shot: 4929

2011-03-24 - 071751

Basic parameters:
  • Chamber pressure pchamber : 3.22->3.17 mPa (vacuum shot)
  • Chamber temperature: 155 grad C
  • CBt capacitors (23 mF) charged to: 400 V
  • CBD capacitors (3.6 mF) charged to: 000 V, triggered 1,0 ms after Bt
  • CCD capacitors (11.3 mF) charged to: 500 V, triggered 1,0 ms after Bt
  • CST capacitors (2.7 mF) charged to: 000 V, triggered 0,0 ms after Bt
  • charging log: t, UB, UBD, UCD, UDS, pchamber
  • Time since session beginning: 681 s
Data (sampling interval Ts=100 kHz):

Diagnostics: (configuration)

MagnOveral

MirnovCoils_JK

Analysis:

SafetyFactor_JK

Thanks to the specific help and