Golem shot: 4968

2011-03-24 - 190115

Basic parameters:
  • Chamber pressure pchamber : 2.34->2.34 mPa (vacuum shot)
  • Chamber temperature: 20 grad C
  • CBt capacitors (23 mF) charged to: 0 V
  • CBD capacitors (3.6 mF) charged to: 000 V, triggered 1,0 ms after Bt
  • CCD capacitors (11.3 mF) charged to: 100 V, triggered 1,0 ms after Bt
  • CST capacitors (2.7 mF) charged to: 000 V, triggered 0,0 ms after Bt
  • charging log: t, UB, UBD, UCD, UDS, pchamber
  • Time since session beginning: 2803 s
Data (sampling interval Ts=100 kHz):

DASs:

NI

TektronixDPO3014
New diagnostics: (configuration)

Lring_PV

FastCameraExilim

Bolometry
Diagnostics: (configuration)

MagnOveral

MirnovCoils_JK

Analysis:

SafetyFactor_JK

Thanks to the specific help and