Comment: Test systemu

Golem shot: 5407

2011-04-18 - 140909



Basic parameters:
  • Chamber pressure pchamber : 0.67->19.12 mPa (request: 20 mPa)
  • Chamber temperature: grad C
  • CBt capacitors ( mF) charged to: 1300 V
  • CBD capacitors (3.6 mF) charged to: 200 V, triggered 3,5 ms after Bt
  • CCD capacitors (11.3 mF) charged to: 600 V, triggered 3,0 ms after Bt
  • CST capacitors (2.7 mF) charged to: 150 V, triggered 5,5 ms after Bt
  • charging log: t, UB, UBD, UCD, UDS, pchamber
  • Time since session beginning: 3504 s
Data (sampling interval Ts=100 kHz):

DAS:

NI.ONN
Diagnostics: (configuration)

MagnOveral_TM

MirnovCoils_JK

FastCamera

Bolometry

Analysis:

SafetyFactor_JK

Spectrograms_TO

Thanks to the specific help and