\(\def\sub#1{_\mathrm{#1}}\def\sup#1{^\mathrm{#1}}\def\maximum#1{max_#1}\) Golem #36868

Tokamak GOLEM - Shot Database - #36868

The date of discharge execution21-06-01 12:08:21 [Shot logbook]
The session mission21_ST_MegiD_IsotopicStudies --> Isotopic studies
The session ID36859
The discharge commentu_bias to 140 V
Discharge command./Dirigent.sh --discharge --UBt 1200 --TBt 1000 --Ucd 700 --Tcd 2000 --preionization 1 --gas He --pressure 15 --comment "u_bias to 140 V" --diagnostics_langballpenprobe "r_LP_tip=50, f_fg=5000, u_fg=7, r_i=27" --ScanDefinition "0"

     Technological parameters

    No Plasma:

Right now the tokamak GOLEM is undergoing discharge execution, the phase called:

BASIC postdischarge analysis

Next phase will be ON STAGE diagnostics.

Wait for the discharge proccess to be completed.

Acknowledgement


Thanks to the specific help

The tokamak GOLEM controll SW @

Diagnostics

Other

Navigation