\(\def\sub#1{_\mathrm{#1}}\def\sup#1{^\mathrm{#1}}\def\maximum#1{max_#1}\) Golem #37080

Tokamak GOLEM - Shot Database - #37080

The date of discharge execution21-06-17 20:28:06 [Shot logbook]
The session mission21_BP_RailProbe_JirkaM_etal --> Rail probe
The session ID37027
The discharge commentrezim nastaven, se stabilizaci, posuv 3mm navic
Discharge command./Dirigent.sh --discharge --UBt 1200 --TBt 0 --Ucd 550 --Tcd 1000 --preionization 1 --gas H --pressure 15 --diagnostics_limitermirnovcoils "vacuum_shot=37050" --infrastructure.radial_stabilization "5000,0;9000,20;17000,0" --infrastructure.vertical_stabilization "14000,1;15000,0" --diagnostics_railprobe "r_rp=83, phi_rp=15.5, u_fg=17, f_fg=5000, offset_fg=4, u_vachar=20, u_sign=-1, r_rp_vachar=14, r_lp_vachar=27" --ScanDefinition "37059 37060 37061 37062 37063 37064 37065 37066 37067 37068 37069" --comment "rezim nastaven, se stabilizaci, posuv 3mm navic"

     Technological parameters

    No Plasma:

Right now the tokamak GOLEM is undergoing discharge execution, the phase called:

Securing post discharge proccesses

Next phase will be postdischarge BASIC analysis.

Wait for the discharge proccess to be completed.

Acknowledgement


Thanks to the specific help

The tokamak GOLEM controll SW @

Diagnostics

Other

Navigation