\(\def\sub#1{_\mathrm{#1}}\def\sup#1{^\mathrm{#1}}\def\maximum#1{max_#1}\) Golem #37112

Tokamak GOLEM - Shot Database - #37112

The date of discharge execution21-06-23 11:01:48 [Shot logbook]
The session mission21MT_MTunkl -->
The session ID37111
The discharge commentdummy : SW develop by master
Discharge command./Dirigent.sh --discharge --UBt 00 --TBt 0 --Ucd 0 --Tcd 1000 --preionization 1 --gas H --pressure 15 --diagnostics.limitermirnovcoils "vacuum_shot=37050" --discharge.position_stabilization "radial_switch='on',vertical_waveform='5000,0;9000,20;17000,0',vertical_switch='on',radial_waveform='7000,0;8000,-10;10000,0'" --ScanDefinition "" --comment "dummy : SW develop by master"

     Technological parameters

    No Plasma:

Right now the tokamak GOLEM is undergoing discharge execution, the phase called:

BASIC postdischarge analysis

Next phase will be ON STAGE diagnostics.

Wait for the discharge proccess to be completed.

Acknowledgement


Thanks to the specific help

The tokamak GOLEM controll SW @

Diagnostics

Other

Navigation