Tokamak GOLEM - Shot Database - 27171

[Template source]
[WebLog]
Date: 2018-05-04 - 09:37:33
Session: Training/2018
Comment: Patek skupina 3 - Sk. 3 - Pouze el. pole

Machine failure: Failure (BtMax) < 0.01T);

    Basic parameters: (compare)

  • Gas pressure pch:0.71->0.71 mPa (request: 0 mPa) WIKI
  • Working gas: None
  • Preionization: OFF
  • Chamber temperature: 25.30 C
  • CBt capacitors charged to: 0 V, triggered 5.0 ms WIKI
  • CBD capacitors charged to: 0 V, triggered 5.0 ms WIKI
  • CCD capacitors charged to: 400 V, triggered 5.0 ms WIKI
  • CST capacitors charged to: 0 V, triggered 5.0 ms WIKI
  • Max saturation of iron core transformator: 88% WIKI
  • Level of noise (dBt) in room: 0.006 V
  • Probability of breakdown: 0% WIKI
  • Time since session beginning: 1:46:30 h
WIKI
WIKI
WIKI
WIKI

Data Acquisition Systems (DAS):


TektronixDPO3014

Papouch_Ja

Papouch_Ji

RigolDS1074a

NIstandard

Papouch_Za

Papouch_St

Papouch_Ko

NIoctopus

Diagnostics:


Interferometer

DoubleRakeProbe

Spectrometer

Bolometers_BL

FastCamera

Analysis:


HistoricalAnalysis

ShotHomepage

AdvancedAnalysis

Impurities_TO

Students:

Guests:

Acknowledgement:


Thanks to the specific help and

Diagnostics

Analysis

DAS

Vacuum log

Other

Navigation