\(\def\sub#1{_\mathrm{#1}}\def\sup#1{^\mathrm{#1}}\def\maximum#1{max_#1}\) Golem #36877

Tokamak GOLEM - Shot Database - #36877

The date of discharge execution21-06-01 12:59:49 [Shot logbook]
The session mission21_ST_MegiD_IsotopicStudies --> Isotopic studies
The session ID36859
The discharge commentPROBLEM with probe position, from 70 again
Discharge command./Dirigent.sh --discharge --UBt 1200 --TBt 1000 --Ucd 700 --Tcd 2000 --preionization 1 --gas He --pressure 15 --comment "PROBLEM with probe position, from 70 again" --diagnostics_langballpenprobe "r_LP_tip=70, f_fg=5000, u_fg=8, r_i=27" --ScanDefinition "36868 36869 36871 36873"

     Technological parameters

    Plasma:

    Plasma parameters:

Basic Diagnostics    

On stage diagnostics

Data flowmeasurement →digitization →analysis →
NameExperiment setupData acquistition systemRaw dataAnalysis results
         



 



         



 



         



 



Right now the tokamak GOLEM is undergoing discharge execution, the phase called:

OFF STAGE postdischarge analysis

Next phase will be Nothing.

Wait for the discharge proccess to be completed.

Acknowledgement


Thanks to the specific help

The tokamak GOLEM controll SW @

Diagnostics

Other

Navigation