\(\def\sub#1{_\mathrm{#1}}\def\sup#1{^\mathrm{#1}}\def\maximum#1{max_#1}\) Golem #37079

Tokamak GOLEM - Shot Database - #37079

The date of discharge execution21-06-17 20:25:25 [Shot logbook]
The session mission21_BP_RailProbe_JirkaM_etal --> Rail probe
The session ID37027
The discharge commentrezim nastaven, se stabilizaci, posuv 3mm navic
Discharge command./Dirigent.sh --discharge --UBt 1200 --TBt 0 --Ucd 550 --Tcd 1000 --preionization 1 --gas H --pressure 15 --diagnostics_limitermirnovcoils "vacuum_shot=37050" --infrastructure.radial_stabilization "5000,0;9000,20;17000,0" --infrastructure.vertical_stabilization "14000,1;15000,0" --diagnostics_railprobe "r_rp=83, phi_rp=14.5, u_fg=17, f_fg=5000, offset_fg=4, u_vachar=20, u_sign=-1, r_rp_vachar=14, r_lp_vachar=27" --ScanDefinition "37059 37060 37061 37062 37063 37064 37065 37066 37067 37068 37069" --comment "rezim nastaven, se stabilizaci, posuv 3mm navic"

     Technological parameters

    No Plasma:

Right now the tokamak GOLEM is undergoing discharge execution, the phase called:

Charging capacitors, introducing working gas, engaging preionization

Next phase will be Arming and countdown.

Wait for the discharge proccess to be completed.

Acknowledgement


Thanks to the specific help

The tokamak GOLEM controll SW @

Diagnostics

Other

Navigation