\(\def\sub#1{_\mathrm{#1}}\def\sup#1{^\mathrm{#1}}\def\maximum#1{max_#1}\) Golem #38534

Tokamak GOLEM - Shot Database - #38534

The date of discharge execution22-04-06 18:01:27 [Shot logbook]
The session mission22 --> Plasma position stabilization
The session ID38519
The discharge commentReferencni po vydoutnani
Discharge command./Dirigent.sh --discharge --UBt 1200 --TBt 0 --Ucd 450 --Tcd 350 --preionization 1 --gas H --pressure 8 --diagnostics.limitermirnovcoils "vacuum_shot=38525" --discharge.position_stabilization "main_switch='off',radial_switch='on',vertical_waveform='3000,0;7000,-10;20000,0;25000,0;30000,0',vertical_switch='on',radial_waveform='2000,0;3000,0;9000,-10;11000,-5;22000,-2;25000,0'" --discharge.preionization "main_switch='on',powsup_heater=80,powsup_accel=100" --ScanDefinition "38532" --comment "Referencni po vydoutnani"

     Technological parameters

    No Plasma:

Right now the tokamak GOLEM is undergoing discharge execution, the phase called:

Charging capacitors, introducing working gas, engaging preionization

Next phase will be Arming and countdown.

Wait for the discharge proccess to be completed.

Acknowledgement


Thanks to the specific help

The tokamak GOLEM controll SW @

Diagnostics

Other

Navigation