\(\def\sub#1{_\mathrm{#1}}\def\sup#1{^\mathrm{#1}}\def\maximum#1{max_#1}\) Golem #38936

Tokamak GOLEM - Shot Database - #38936

The date of discharge execution22-04-27 12:32:46 [Shot logbook]
The session missionGOLEM --> EDU
The session ID38935
The discharge commentBiasing probe 70mm from plasma centre, double rake probe at 55 mm, Lang_BPP probe at 55 mm
Discharge command./Dirigent.sh --discharge --UBt 800 --TBt 0 --Ucd 450 --Tcd 1000 --preionization 1 --gas H --pressure 16 --comment "Biasing probe 70mm from plasma centre, double rake probe at 55 mm, Lang_BPP probe at 55 mm" --diagnostics_biasingelectrode 5000,0;7000,20;10000,-20;13000,0 --ScanDefinition "36592 36593 36594 36595 36596 36597 36598 36599 36600 36601" --DataProcessing off

     Technological parameters

    No Plasma:

Right now the tokamak GOLEM is undergoing discharge execution, the phase called:

BASIC postdischarge analysis

Next phase will be ON STAGE diagnostics.

Wait for the discharge proccess to be completed.

Acknowledgement


Thanks to the specific help

The tokamak GOLEM controll SW @