Tokamak GOLEM - Shot Database - #39330 
The date of discharge execution | 22-06-13 19:34:48 [Shot logbook] |
---|
The session mission | 0622 --> RE session preparation  |
---|
The session ID | 39312  |
---|
The discharge comment | vert&rad stab vert drive |
---|
Discharge command | ./Dirigent.sh --discharge --UBt 1150 --TBt 0 --Ucd 700 --Tcd 1900 --preionization 1 --gas H --pressure 10 --diagnostics.limitermirnovcoils "vacuum_shot=39316" --discharge.preionization "main_switch='on',powsup_heater=80,powsup_accel=100" --discharge.position_stabilization "main_switch='on',radial_switch='on',vertical_waveform='3000,0;12000,-20;22000,0;30000,0',vertical_switch='on',radial_waveform='2000,0;3000,0;9000,0;12000,-20;24000,0;25000,0'" --ScanDefinition "39323 39326 39329" --comment "vert&rad stab vert drive" |
Right now the tokamak GOLEM is undergoing discharge execution, the phase called:
Charging capacitors, introducing working gas, engaging preionization
Next phase will be Arming and countdown.
Wait for the discharge proccess to be completed.
Acknowledgement
Thanks to the specific help
The tokamak GOLEM controll SW @ 