Tokamak GOLEM - Shot Database - 10273

[Template source]
[WebLog]
Date: 2012-11-08 - 21:34:05
Session:Practica/PraktikaFyzikyPlazmatu/2012/PavelkaLangProbes [new]
Comment: Mereni plovouciho potencialu v H doutnavem vyboji, Ucd 10V, no plasma control measurement, p=2.8 mPa

Machine failure: Failure (BtMax) < 0.01T);

    Basic parameters: (compare)

  • Gas pressure pch:2.62->2.60 mPa (request: 800 mPa) WIKI
  • Working gas: N/A
  • Preionization: OFF
  • Chamber temperature: N/A C
  • CBt capacitors changed to: 2 V, triggered 5.0 ms WIKI
  • CBD capacitors changed to: 0 V, triggered 8.0 ms WIKI
  • CCD capacitors changed to: 10 V, triggered 7.0 ms WIKI
  • CST capacitors changed to: 0 V, triggered 5.0 ms WIKI
  • Probability of breakdown: 0% WIKI
  • Time since session beginning: 2:52:06 h
WIKI
WIKI
WIKI
WIKI

Data Acquisition Systems (DAS):


NIstandard

Papouch

NIbasic

Diagnostics:


PlasmaPosition

Flukes

RakeProbe

RakeProbePavelka

HXR

FastCamera

Spectrometer

Analysis:


AdvancedAnalysis

HistoricalAnalysis

ShotHomepage

Impurities

Acknowledgement:


Thanks to the specific help and

Diagnostics

Analysis

DAS

Vacuum log

Other

Navigation