\(\def\sub#1{_\mathrm{#1}}\def\sup#1{^\mathrm{#1}}\def\maximum#1{max_#1}\) Golem #44677

Tokamak GOLEM - Shot Database - #44677

24-04-26 17:50:21 [Shot logbook]
The session missionDiagnostics/Magnetic/Events/0424CalibrationWith3Dprobe/golemCalibration of magnetic fields with 3D Hall probe
The session ID 44657
The discharge comment3D hall probe calibration - both stabs pokus 2, r=-44,z=69 mm
Discharge command/Dirigent.sh --discharge --operation.discharge "style='standard',vacuum_shot='-1'" --infrastructure.bt_ecd "U_Bt=0,t_Bt=0,O_Bt='CW',U_cd=0,t_cd=0,O_cd='CW'" --infrastructure.workin ...

     Technological parameters

    No Plasma:

Right now the tokamak GOLEM is undergoing discharge execution, the phase called:

Preparing discharge environment at the GOLEM server

Next phase will be Means ....

Wait for the discharge proccess to be completed.

Acknowledgement


Thanks to the specific help

The tokamak GOLEM controll SW @

Navigation

Other