Tokamak GOLEM - Shot Database - #47283

[Shot logbook]
Time stamp | |
---|
| 24-12-16 13:03:51 |
---|
The session mission | Diagnostics/Radiation/StripDetector/CommissioningCommissioning of REs diagnostics |
---|
The session ID  | 47267  |
---|
The discharge comment | He, l=95mm |
---|
Discharge command  | /Dirigent.sh --discharge --operation.discharge "style='standard'" --infrastructure.bt_ecd "U_Bt=1000,t_Bt=0,U_cd=700,t_cd=1000,O_Bt='CW',O_cd='CW'" --infrastructure.workinggas "S_m ... |
Plasma:

Plasma parameters:
On stage diagnostics
Basic diagnostics Data flow:

Documentation:
Scintillation probes Data flow:
Documentation:

Parameters:U_NIM_A1=600,U_NIM_A2=600,U_NIM_A3=600,U_NIM_A4=600
Strip detector Data flow:

Documentation:

Parameters:acq_time=200,acq_delay=200,acq_mode='0'
Right now the tokamak GOLEM is undergoing discharge execution, the phase called:
OFF STAGE postdischarge analysis
Next phase will be Finalization.
Wait for the discharge proccess to be completed.
Acknowledgement
Thanks to the specific help
The tokamak GOLEM controll SW @ 