Tokamak GOLEM - Shot Database - #48612

| Time stamp | |
|---|
| 25-04-16 18:29:14 |
[Shot logbook]| The session mission | Infrastructure/CurrentStabilization/WholeStabilizationCommmissioning the whole stabilization technology |
|---|
The session ID  | 48612  |
|---|
| The discharge comment | Back to Plasma Current Optimization |
|---|
Discharge command  | /Dirigent.sh --discharge --operation.discharge "style='remote',voice='on',analysis='on'" --infrastructure.bt_ecd "U_Bt=900,t_Bt=0,U_cd=350,t_cd=600,O_Bt='CW',O_cd='CW'" --infrastru ... |
Plasma:

Plasma parameters:
On stage diagnostics
Basic diagnostics Data flow:

Documentation:
Fast cameras Data flow:

Documentation:

Parameters:fr_ux100a=1200,height_ux100a=56,recrate_ux100a=40000,shotdur_ux100a=40,width_ux100a=1280,fr_ux100b=1
Right now the tokamak GOLEM is undergoing discharge execution, the phase called:
OFF STAGE postdischarge analysis
Next phase will be Finalization.
Wait for the discharge process to be completed.
Acknowledgement
Thanks to the specific help
The tokamak GOLEM controll SW @ 