\(\def\sub#1{_\mathrm{#1}}\def\sup#1{^\mathrm{#1}}\def\maximum#1{max_#1}\) Golem #36772

Tokamak GOLEM - Shot Database - #36772

The date of discharge execution21-05-25 10:05:13 [Shot logbook]
The session mission21_MD_IsotopicStudies --> Isotopis studies
The session ID36771
The discharge commentStandardni test dlouhodobe stability
Discharge command./Dirigent.sh --discharge --UBt 800 --Ucd 400 --Tcd 1000 --Tres 2000 --pressure 20 --preionization 1 --comment "Standardni test dlouhodobe stability"

     Technological parameters

    Plasma:

    Plasma parameters:

Basic Diagnostics    

On stage diagnostics

         



 



Right now the tokamak GOLEM is undergoing preparation phase called:

OFF STAGE postdischarge analysis

Next phase will be Nothing.

Wait for the discharge proccess to be completed.

Acknowledgement


Thanks to the specific help

The tokamak GOLEM controll SW @

Diagnostics

Other

Navigation