\(\def\sub#1{_\mathrm{#1}}\def\sup#1{^\mathrm{#1}}\def\maximum#1{max_#1}\) Golem #41869

Tokamak GOLEM - Shot Database - #41869

The date of discharge execution23-05-17 12:56:05 [Shot logbook]
The session missionTrainingCourses/Universities/MEPhI.ru/23BiasingAndMHD --> MHD studies with biasing
The session ID41863
The discharge commentMaster standard operation
Discharge command/Dirigent.sh --discharge --operation.discharge "style='standard',vacuum_shot=41866" --infrastructure.bt_ecd "U_Bt=1000,t_Bt=0,O_Bt='CW',U_cd=450,t_cd=0,O_cd='CW'" --infrastructure. ...

     Technological parameters

    No Plasma:

Basic Diagnostics    

On stage diagnostics

Data flowmeasurement →digitization →analysis →
NameExperiment setupData acquistition systemRaw dataAnalysis results
         



 



         



Off stage diagnostics

Data flowmeasurement →digitization →analysis →
NameExperiment setupData acquistition systemRaw dataAnalysis results
         



 



         



         



         



         



 



Infrastructure

Working gas:S_mode='U_v',S_gas='H',U_v=20.5,p_H=-1
Bt, Ecd:U_Bt=1000,t_Bt=0,O_Bt='CW',U_cd=450,t_cd=0,O_cd='CW'


Position stabilization: main_switch='on',vertical_switch='on',vertical_waveform='3000,0;7000,-5;8000,-20;30000,0',radial_switch='on',radial_waveform='2000,0;3000,0;5000,-20;30000,0'--diagnostics.limitermirnovcoils




Biasing electrode:main_switch='on',position=102,waveform='1000,0;2000,5;5000,0;6000,0;14000,0'






The tokamak GOLEM is now in the Standby mode.

Acknowledgement


Thanks to the specific help

The tokamak GOLEM controll SW @