Golem #41871

On stage diagnostics

Data flowmeasurement →digitization →analysis →
NameExperiment setupData acquistition systemRaw dataAnalysis results
         



 



         



Off stage diagnostics

Data flowmeasurement →digitization →analysis →
NameExperiment setupData acquistition systemRaw dataAnalysis results
         



 



         



         



         



         



Infrastructure

Working gas:S_gas='H',p_H=16
Bt, Ecd:U_Bt=600,t_Bt=0,O_Bt='CW',U_cd=400,t_cd=0,O_cd='CW'


Position stabilization:




Biasing electrode:






The tokamak GOLEM is now in the Standby mode.

Acknowledgement


Thanks to the specific help

The tokamak GOLEM controll SW @