Experiments/BreakDownStudies/ECRHassisted/SustainedBreakdownConditions/161114afterMWHWupgrade_VoSvHoSt/index

#Session report

  • 2014-11-16
  • VoSv & HoSt
  • From #17225 to #17247.
  • 0 ms is the time of the discharge sequence and DAS start.
  • 5 ms is the time of the toroidal magnetic field \(B_t\) start.
  • ECR energy is launched from 5 to 11 ms.
  • Capacitors charged to: \(U_B\) = 800V & \(U_{cd}\) ~ 250V (200V request)

Typical physical quantities relations

e.g. #17233, where \(T_{cd}\) = 14 ms

\(T_{cd}\) scan @ \(p_{WG}=+3\) mPa


(jpg, svg,canvas,script)

Effect check without MW energy


(jpg, svg,canvas,script)

\(U_{bd}\) versus \(T_{cd}\)

  • Be carefull, the algorith detecting \(U_{bd}\) is not absolutely good.


(jpg, svg,script)

References