Experiments/BreakDownStudies/ECRHassisted/SustainedBreakdownConditions/161114afterMWHWupgrade_VoSvHoSt/index
#Session report
- 2014-11-16
- VoSv & HoSt
- From #17225 to #17247.
- 0 ms is the time of the discharge sequence and DAS start.
- 5 ms is the time of the toroidal magnetic field \(B_t\) start.
- ECR energy is launched from 5 to 11 ms.
- Capacitors charged to: \(U_B\) = 800V & \(U_{cd}\) ~ 250V (200V request)
Typical physical quantities relations
e.g. #17233, where \(T_{cd}\) = 14 ms
\(T_{cd}\) scan @ \(p_{WG}=+3\) mPa
Effect check without MW energy
\(U_{bd}\) versus \(T_{cd}\)
- Be carefull, the algorith detecting \(U_{bd}\) is not absolutely good.