Tokamak GOLEM - Shot Database - #47977

[Shot logbook]
Time stamp | |
---|
| 25-03-06 18:17:39 |
---|
The session mission | Infrastructure/CurrentStabilization/Buryanec-CommissioningAETechron-2025Commmissioning of I_p stabilization technology |
---|
The session ID  | 47942  |
---|
The discharge comment | Repeat discharge 47902 and current stab on, position stab on modify current stad cobination waveform |
---|
Discharge command  | /Dirigent.sh --discharge --operation.discharge "style='standard',vacuum_shot='-1'" --infrastructure.bt_ecd "U_Bt=900,t_Bt=0,O_Bt='CW',U_cd=350,t_cd=500,O_cd='CW'" --infrastructure. ... |
Plasma:

Plasma parameters:
On stage diagnostics
Basic diagnostics Data flow:

Documentation:
Off stage diagnostics
Analysis
Infrastructure
Chamber
Bt and Ecd
,
Parameters

:U_Bt=900,t_Bt=0,O_Bt='CW',U_cd=350,t_cd=500,O_cd='CW'
Working gas
Parameters

:S_mode='p_wg',S_gas='H',p_H=15,U_v=18
Position stabilization
:
Parameters

:main_switch='on',radial_switch='on',radial_waveform='1000,0;2000,-5;5000,0;6000,-20;30000,0',vertical_switch='on',vertical_waveform='1000,0;2000,-5;7000,-10;8000,-20;30000,0'
Current stabilization
Parameters

:main_switch='on',waveform='1000,0;5000,5;10000,7;14000,10;24000,-4;28000,-8;35000,0'
Acknowledgement
Thanks to the specific help
The tokamak GOLEM controll SW @ 