Golem #48019

Tokamak GOLEM - Shot Database - #48019

[Shot logbook]
Time stamp
25-03-10 17:59:29
The session missionInfrastructure/CurrentStabilization/Buryanec-CommissioningAETechron-2025Commmissioning of I_p stabilization technology
The session ID 47999
The discharge commentrepeat 47990 reduce U_cd to 300V, reduce windings to 25,modify vaweform
Discharge command/Dirigent.sh --discharge --operation.discharge "style='remote',voice='on',analysis='on'" --infrastructure.bt_ecd "U_Bt=1000,t_Bt=0,U_cd=300,t_cd=1000,O_Bt='CW',O_cd='CW'" --infrast ...

     Technological parameters

    Plasma:

    Plasma parameters:

Basic Diagnostics    

On stage diagnostics

Basic diagnostics Data flow:  Documentation:

         

Fast cameras Data flow:  Documentation:

Parameters:fr_ux100a=1200,height_ux100a=56,recrate_ux100a=40000,shotdur_ux100a=30,width_ux100a=1280,fr_ux100b=1
         

Off stage diagnostics

Analysis

NameAnalysis results

Infrastructure

Chamber

Bt and Ecd ,

Parameters :U_Bt=1000,t_Bt=0,U_cd=300,t_cd=1000,O_Bt='CW',O_cd='CW'

Working gas

Parameters :S_mode='p_wg',S_gas='H',p_H=15,U_v=22

Position stabilization :

Parameters :main_switch='on',radial_switch='on',radial_waveform='1000,0;2000,-5;6000,-5;6000,-20;30000,0',vertical_switch='on',vertical_waveform='1000,0;2000,-5;7000,-10;8000,-20;30000,0'
 
 

Current stabilization

Parameters :main_switch='on',waveform='1000,0;2000,2;10000,5;15000,10;25000,-10;30000,7;35000,-5;40000,0'

Acknowledgement


Thanks to the specific help

The tokamak GOLEM controll SW @

Navigation

Other