TrainingCourses/Occasionals/0415Ahmedabad.in/index
Results
- Testing discharge before the presentation #19353
- Discharge performed during the presentation #19354
- Discharges from participants:
Important notes (apologies):
- we had to change all discharg setups from ECR to thermal emission (electron gun) kind of preionization (technological problem).
- Helium discharges need some time to stabilize after hydrogen discharges. We performed all discharges in Hydrogen.
The tokamak GOLEM demonstration for 10\(^{th}\) IAEA TM @ Ahmedabad
Participants are welcome to test the remote operation ability of the tokamak GOLEM.
Please indicate somehow yourself in the discharge comment formular field. Feel free in the choice of parameters, parameteres are limited for safe operation of the device.
Proposed steps
Prepare the discharge
Open the “Control room” tab, made your choice of the technology parameters and submit the discharge (indicate yourself in the “Discharge comment box”)Check the queue of the submitted discharge setups
Open the “Queue” tab and you can control actual situation.Check the results
Finally you can watch the results in the shot database in the form http://golem.fjfi.cvut.cz/shots/<DischargeNumber>Production
Presentation
Contact
Links
Offline videos
Tokamak room camera
- 15th s: discharge
Tokamak vessel camera
- 4th s: preionization
- 15th s: discharge